2K BeatBoard
All titles

Tiny Tina's Wonderlands

DelayedPhase · post launch

Next milestone: Glutton's Gamble Encore — community comms re-announce (Davide sign-off) · May 29, 2026

Today's read · Claude

**Next:** May 29. Community comms re-announce (Davide sign-off owed). Engineering stability blocker: Eng Producer confirms realistic re-date July 10 (was June 5). 65K standalone-page wishlisters get a Steam notification the moment we update the page. Coordinating draft with Marcus (Community Lead) per Sentiment Defense playbook: lead with quality, not delay. Draft in your inbox EOD Friday. Paid surge re-timing to July window queued for Heaven once you sign.

Phase gate · DLC drop readiness:Blocked/ Eng sign-offblocked
Phase-gate blocker
Engineering stability blocker — Eng Producer realistic re-date July 10. 65K standalone wishlisters get Steam notification on date shift. Coordinating draft comms re-announce with Community Lead for Davide sign-off EOD May 29.

Slack digest · Claude across 2 channels

2 messages · 2 flagged for action · synthesized May 26, 12:00 AM
Encore date slip confirmed — re-announce comms need Davide sign-off

The Glutton's Gamble Encore can't hit June 5: there's a reliable crash repro on the second-arena encounter transition, and the Eng Producer's realistic re-date is July 10. The marketing problem is the 65K standalone wishlisters who get a Steam notification the moment the date moves, so the comms framing is load-bearing. Marcus is drafting the re-announce — leading with stability-over-rush and a concrete July 10 target — and it needs Davide's sign-off before it goes out EOD Friday.

Needs you
  • Re-announce comms for the July 10 Encore slip drafted, awaiting Davide sign-off before EOD Friday (65K wishlisters notified on date change).WND-1782
By channel
  • wonderlands-community1 msg · 1 flagged
    Community comms

    Date-slip re-announce in draft — leading with the why (stability over a rushed drop) and a concrete July 10 target. Needs Davide sign-off.

  • wonderlands-live1 msg · 1 flagged
    Engineering + production status

    Reliable crash repro on the second-arena transition. Can't ship June 5; realistic new date July 10. Eng looping in comms.

d7 retention pct
24.1
Target 27
wishlist velocity daily
388
Target 420
review score pct
81
Target 80

Internal collaborators · this title

Aggregated across 1 featured beat on Tiny Tina's Wonderlands
Marketing owner
Alex Akiyama
  • EngineeringInternal
    Stability gate (blocker source)
    Responsible for · this cycle
    • ·Patch certification for July 10 re-date(Glutton's Gamble Encore — DLC Drop)
    • ·Eng Producer sign-off(Glutton's Gamble Encore — DLC Drop)
    Delivers to
    Product, Alex Akiyama
  • ProductInternal
    Re-date confirmation
    Responsible for · this cycle
    • ·Steam page date update(Glutton's Gamble Encore — DLC Drop)
    • ·Wishlister notification fire trigger(Glutton's Gamble Encore — DLC Drop)
    Depends on
    Engineering sign-off
    Delivers to
    Community Lead, Heaven Media
  • Community Lead (Marcus Lee)Internal
    Re-announce comms drafter
    Responsible for · this cycle
    • ·Quality-led re-announce post draft(Glutton's Gamble Encore — DLC Drop)
    • ·1hr sentiment ack window monitoring(Glutton's Gamble Encore — DLC Drop)
    Depends on
    Legal redline, Davide sign-off
    Delivers to
    Wishlister cohort (65K)
  • LegalInternal
    Comms redline
    Responsible for · this cycle
    • ·Re-announce language review(Glutton's Gamble Encore — DLC Drop)
    Depends on
    Community Lead draft
    Delivers to
    Alex Akiyama (for Davide routing)
Standard partner functions · not engaged on featured beats this cycle
Brand CreativeProduct / Post-Launch ContentCommunity LeadPerformance Marketing

Vendors on this title

Heaven Media
9 tickets
Lead UA for the BL4 Mad Ellie SP1 sustain window (Phase 2 paid surge held pending D30, timed to Whispering Glacier endgame content beat window)
CreatorIQ
1 tickets
Shortlist 40 micro/nano FPS-adjacent creators for Free Weekend (delivery Friday)